Bids will be posted until Thursday 11/04/10 at 5:00 p.m.
Bids submitted at the time of the bid closing, will be considered "FINAL"
If you bid on multiple bids, you MUST prioritize your level of preference for
the bids that you placed for this week.
Your bids must be prioritized before you "Sign up" for the Bid.
If you want to change your bid priority, you must "Remove" your name from the
bid, submit your new priority for the bids and then "Sign up" for the bid
again.
If bids are not prioritized, bids will be forced ranked in the order that the
bids were posted.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Bid #680 Quality Leader
Dept: Body
Shift: 2
# of Openings: 6
Bid #681 Quality Leader
Dept: Body
Shift: 3
# of Openings: 13
Bid #682 Quality Leader
Dept: Paint
Shift: 2
# of Openings: 1
Bid #683 Quality Leader
Dept: Paint
Shift: 3
# of Openings: 7
Bid #684 Quality Leader
Dept: Final
Shift: 2
# of Openings: 25
Bid #685 Quality Leader
Dept: Final
Shift: 3
# of Openings: 39
Bid #686 Repair General
Dept: Pre-Delivery
Shift: 3
# of Openings: 5
Bid #687 Paint Repair
Dept: Pre-Delivery
Shift: 3
# of Openings: 3
Bid #688 Metal Touch Up & Repair
Dept: Body
Shift: 3
# of Openings: 3
Bid #689 Inspector Body
Dept: Body
Shift: 2
# of Openings: 6
Bid #690 Inspector Body
Dept: Body
Shift: 3
# of Openings: 10
Bid #691 Repair General (Shop)
Dept: Pre-Delivery
Shift: 3
# of Openings: 6
Bid #692 Repair General (System)
Dept: Final Area
Shift: 2
# of Openings: 3
Bid #693 Repair General (System)
Dept: Final Area
Shift: 3
# of Openings: 3
Bid #694 Paint Repair
Dept: Paint
Shift: 2
# of Openings: 11
Bid #695 Paint Repair
Dept: Paint
Shift: 3
# of Openings: 17
Link to the post:
uawlap.org/louisville-assembly-plant/bids/bid-letter-110110.php
Link to UAWLAP.org: uawlap.org
UAWLAP.org Site.
Details of the post follow.
In Solidarity,
Steven M. Stone
Bid Letter 11/01/10
Bids will be posted until Thursday 11/04/10 at 5:00 p.m.
Bids submitted at the time of the bid closing, will be considered "FINAL"
If you bid on multiple bids, you MUST prioritize your level of preference for
the bids that you placed for this week.
Your bids must be prioritized before you "Sign up" for the Bid.
If you want to change your bid priority, you must "Remove" your name from the
bid, submit your new priority for the bids and then "Sign up" for the bid
again.
If bids are not prioritized, bids will be forced ranked in the order that the
bids were posted.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Bid #680 Quality Leader
Dept: Body
Shift: 2
# of Openings: 6
Bid #681 Quality Leader
Dept: Body
Shift: 3
# of Openings: 13
Bid #682 Quality Leader
Dept: Paint
Shift: 2
# of Openings: 1
Bid #683 Quality Leader
Dept: Paint
Shift: 3
# of Openings: 7
Bid #684 Quality Leader
Dept: Final
Shift: 2
# of Openings: 25
Bid #685 Quality Leader
Dept: Final
Shift: 3
# of Openings: 39
Bid #686 Repair General
Dept: Pre-Delivery
Shift: 3
# of Openings: 5
Bid #687 Paint Repair
Dept: Pre-Delivery
Shift: 3
# of Openings: 3
Bid #688 Metal Touch Up & Repair
Dept: Body
Shift: 3
# of Openings: 3
Bid #689 Inspector Body
Dept: Body
Shift: 2
# of Openings: 6
Bid #690 Inspector Body
Dept: Body
Shift: 3
# of Openings: 10
Bid #691 Repair General (Shop)
Dept: Pre-Delivery
Shift: 3
# of Openings: 6
Bid #692 Repair General (System)
Dept: Final Area
Shift: 2
# of Openings: 3
Bid #693 Repair General (System)
Dept: Final Area
Shift: 3
# of Openings: 3
Bid #694 Paint Repair
Dept: Paint
Shift: 2
# of Openings: 11
Bid #695 Paint Repair
Dept: Paint
Shift: 3
# of Openings: 17