Post by tonyp on Dec 13, 2010 16:51:36 GMT -5
last job off chassis will be 1pm Thursday
|
|
|
Post by lapbrian on Dec 13, 2010 19:03:44 GMT -5
that's about right. line 1 in trim needs 984 more. if we can run 510 tuesday that leaves 474 for wednesday. if everything runs smoothly line 1 in trim should be done around 3:45 wednesday. it takes another 6-7 hours of line time to get it off the end of chassis from there.
|
|
|
Post by zj on Dec 13, 2010 19:22:38 GMT -5
line 6 needs approx 1107, 510 the next two days would give us about 87 left for thurs morng
|
|
|
Post by lapbrian on Dec 14, 2010 19:16:38 GMT -5
461 more jobs for line 1. If we run like we did today, which wasn't that good, we will be done around 3:30. So line 1 and 2 should be done and possibly half of line 3 before we leave tommorrow.
|
|
|
Post by Jr on Dec 14, 2010 21:55:10 GMT -5
505 to 510 left at 398 wire line 3
|
|
|
Post by turbo350 on Dec 15, 2010 4:44:44 GMT -5
540 engines left to hang
|
|
24vic
New Member
Posts: 8
|
Post by 24vic on Dec 15, 2010 13:32:18 GMT -5
just lay in there and get it jr
|
|
|
Post by Jr on Dec 15, 2010 21:32:01 GMT -5
just lay in there and get it jr Nope!!! 15 or so more trucks and I'm Done!!! Time for an extended vacation...Lol
|
|
|
Post by tonyp on Dec 15, 2010 22:34:47 GMT -5
I like how they want us to roll up those filthy nasty mats so when we get all this new stuff in here we can unroll them and reuse them. 600 m you think we could get new ones.
|
|
|
Post by wallflower on Dec 15, 2010 22:59:17 GMT -5
SSSSSHHHHHHHHHHH. Don't tell anybody this tonyp, but contractually, the mats belong to skilled trades and production doesn't have to roll them up.
|
|