Production Schedule for the Week of 2/23/15
The daily production schedule will be: Department Hours Body A, B, C Crew 11.5 Paint A, B, C Crew 11.5 Paint East/West Hang 11.5 Final 10.7 Final Repair, Alignment, Roll Test, Drivers 11.5 Tire and Wheel 10.7 Pre Delivery including Repair and Utility 11.5 Materials 11.5
A Crew Mandatory Overtime • 3/1/15 Sunday A Crew 10.0 hours 6am start (volume loss make up) • 3/22/15 Sunday A Crew 10.0 hours 6am start (volume loss make up)
B Crew Mandatory Overtime • 3/14/15 Saturday B Crew 10.0 hours 6pm start (volume loss make up)
This is a tentative schedule based on customer demand, part availability and the plant making daily production. Mandatory Overtime shifts are scheduled to work 10 hours per shift. This is a Mandatory overtime assignment as referenced in Volume 1, Appendix H, and Article 10. Overtime Scheduling note: If you are not asked to work and show up to work. You may be disciplined. Production Schedule hours will remain valid until an update is published. Labor Relations
|
|
|
Post by JoePieper on Feb 26, 2015 4:54:43 GMT -5
They can do that.
|
|
|
Post by utility on Mar 5, 2015 21:08:55 GMT -5
no we were told this week don't want to do anything that would cause us to lose our product !! scare tactic by our union !!
|
|
|
Post by utility on Mar 5, 2015 21:10:48 GMT -5
SCARE TACTIC BROUGHT UP THIS WEEK BY OUR COMMITTEE MAN ! THEN CALLED OUT ON IT !! AND DALE WALK AWAY !!
|
|